PDF Name | PM Kusum Yojana Guidelines (2024 Revised) PDF |
---|---|
Last Updated | January 23, 2024 |
No. of Pages | 73 |
PDF Size | 8.49 MB |
Language | English |
Category | Central Government |
Topic / Tag | Solar Subsidy Scheme |
Source(s) / Credits | cdnbbsr.s3waas.gov.in |
New revised and comprehensive guidelines for implementation of Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyaan (PM-KUSUM) Scheme. Guidelines for Implementation of New Scheme for Farmers for Installation of Solar Pumps and Grid Connected Solar Power Plants has been updated on 17 January 2024.
पीएम-कुसुम योजना के लिए नए दिशा-निर्देश:
प्रधानमंत्री किसान ऊर्जा सुरक्षा और उत्थान महाभियान (पीएम-कुसुम) योजना के लागू करने के लिए नए और समृद्धि-युक्त मार्गदर्शिकाएं तैयार की गईं हैं। किसानों के लिए सोलर पंप और ग्रिड संबंधित सोलर पावर प्लांट्स की स्थापना के लिए नई योजना के नए दिशा-निर्देश तैयार किए गए हैं, जो 17 जनवरी 2024 को अपडेट किए गए हैं।
In supersession to this Ministry’s Office Memorandum 32/645/2017-SPV Division dated 22.07.2019 regarding guidelines or implementation of Pradhan Mantri Kisan Urja Suraksha Evam Uhaan Mahabhiyaan (PM-KUSUM) Scheme and all the amendments so far under this scheme, it has been decided t issue a comprehensive guidelines for implementation of PM KUSUM Scheme, with following components:
- Component-A: Seting up of 10,000 MW of Decentralized Ground/ Stilt Mounted Grid Connected Solar or other Renewable Energy based Power Plants;
- Component-B: Installation of 14 Lakh Stand-alone Solar Agriculture Pumps;
- Component-C: Solarisation of 35 Lakh Grid Connected Agriculture Pumps including Feeder Level Solarization.
The comprehensive guidelines for implementation of PM KUSUM Scheme are enclosed and can be download in PDF format using the download button below.
Text at the beginning of the New Guidelines of PM Kusum Scheme
Government of India has taken various policy measures to increase the installed power generation capacity from non-fossil fuel sources by 2030. To provide energy and water security to farmers and enhance their income, de-dieselize the farm sector, and reduce environmental pollution, the Government of India launched PM-KUSUM on 08.03.2019.
During 2020-21, the scheme was scaled-up and expanded from its pilot stage and notified with due approval of Ministry of Finance. In August 2022, the scheme was extended till March 2026.